Maintenance (CMMS)

Maintenance that keeps crews moving and planners informed.

Work orders and service requests that are quick to create and close, on a map everyone shares, with the failure, parts and cost data your asset plans need captured along the way.

Operate and maintain / Work ordersDemo City
Main StreetRidge Road1234WO-26-1187 · P1Water main break, joint
Work orderPriorityProblemStatus
WO-26-1187P1Water main break, jointIn progress
WO-26-1184P2Hydrant leakingScheduled
WO-26-1179P3Sidewalk trip hazardApproved
WO-26-1176P4Valve exercising, Zone 3Scheduled
WO-26-1170P3Catch basin blockedCompleted
WO-26-1187P1

Water main break

Scanned WM-1042 · Cast iron 150 mm

Labour hours6.5
Materials (1)▾

Failure report

Problem
Break, circumferentialJointLeak
Cause
CorrosionFrostAge
Remedy
ClampCut out section
Complete work order
From request to record

Every job follows one clear path.

  1. Request

    It comes in

    A resident, a tenant, a staff member, a patrol or an alarm reports a problem by web, phone, email or counter. It is placed on the map.

  2. Plan

    The job is set up

    Create one or more work orders from the request, the map, an asset or a QR label, with a priority from P1 to P4.

  3. Do

    The crew closes it

    Problem, cause and remedy from short pick lists, parts from the truck or the stores, hours and costs on lines.

  4. Learn

    The plan improves

    Failures linked to the asset count toward its health, so the next forecast reflects what crews found.

For crews

Built for the truck, not the desk.

Scan a QR label or an existing barcode to open the asset. Pick what failed, why and what you did. Record the parts and hours, and close the job.

  • Scan new QR labels or the barcodes you already have
  • A few taps to code a failure, with comments when you need them
  • Works offline, and syncs your changes when you reconnect
  • Parts issued from the truck or the stores, checked against what is on hand
WO-26-1187P1

Water main break

Scanned WM-1042 · Cast iron 150 mm

Labour hours6.5
Materials (1)▾

Failure report

Problem
Break, circumferentialJointLeak
Cause
CorrosionFrostAge
Remedy
ClampCut out section
Complete work order
For supervisors

See every job on the map.

Open work orders and service requests on one map, filtered by type, status, priority and date. Know what is waiting, why, and what is due next.

  • Priorities from P1 emergency to P4 planned
  • A status for every stage, with a reason when work is waiting
  • Corrective, preventive, inspection, operational, capital and regulatory work types
NewApprovedScheduledIn progressWaitingCompletedClosed
Operate and maintain / Work ordersDemo City
Main StreetRidge Road1234WO-26-1187 · P1Water main break, joint
Work orderPriorityProblemStatus
WO-26-1187P1Water main break, jointIn progress
WO-26-1184P2Hydrant leakingScheduled
WO-26-1179P3Sidewalk trip hazardApproved
WO-26-1176P4Valve exercising, Zone 3Scheduled
WO-26-1170P3Catch basin blockedCompleted
Everything in one place

Less typing for crews. Better data for planners.

Service requests

Requests from the web, phone, email or counter, located on the map, creating as many work orders as the job needs.

Failure coding

Problem, cause and remedy picked from short lists by asset group, so failures can be counted and compared.

Stores and parts

Stores by department or shared, with access per store, stock codes and barcodes scanned by phone camera or handheld scanner, and parts that fit an asset shown first. Availability checks mean two jobs cannot take the last part.

Job plans and safety checks

Standard job plans with steps, hold points and safety checks that must be ticked before a job can be completed.

Preventive maintenance

Plans by time, meter readings or condition, projected on each asset’s deterioration curve, generating work orders without ever creating the same one twice.

Planner and crew calendar

Each crew’s hours against capacity, holidays and time off, “Find a time”, and drag work to another day. Two-way sync with Outlook and Google calendars.

Maintenance KPIs

Measures such as preventive maintenance compliance, backlog and work waiting on parts.

Connected to planning

With Plan, the same assets and map: failures feed asset health, and condition-based maintenance plans follow each asset’s deterioration curve. With Deliver, deficiencies and warranty items become work orders.

QR and barcode labels

Print label sheets, or use the barcodes you already have, to open the asset record from any phone.

See all features (10 more)

Costs from lines

Labour, materials, equipment and contractor costs add up from their lines, at the price when the work was done.

Team board

Work orders as cards on a board, dragged from one status to the next.

Tools and equipment

Vehicles, plant, tools and test devices, booked from a work order so they are never in two places, and added to its costs.

Notifications

People are told when work is assigned to them, when it is due and when it is late, in Mainpath and by email.

Purchasing

Requisitions and purchase orders with their own approvals, blanket orders with agreed prices, services and non-stock goods, receiving in part or full, and returns, with separation of duties on by default.

Lockout and tagout

Energy isolation procedures per asset or class, each person’s own lock with verification, group lockout and a lock register. Work cannot be completed or closed past a lock.

Reliability and cost of ownership

Downtime and its causes, mean time to repair and between failures, availability, repeat failures, cost of ownership from actual costs, and time estimates from similar jobs.

Warranties and duplicates

Warranties on assets and parts with a notice when work is raised, claims and recoveries, and possible duplicate requests flagged before a crew goes out twice.

Timesheets

Hours on a weekly timesheet write the work order's labour lines, so costs and KPIs stay right.

Available with Inspect

Inspections

Inspection forms, assignments on the map and an offline field app, with results reviewed before they reach the register. Defects found can raise service requests or work orders.

Next stop

See a work order go from the street to the plan.

We will show a service request becoming a work order, a coded failure, and an update to the asset's health.